Q.1.

Water required per bag of cement, is

Q.2.

Pick up the correct statement from the following:

Q.3.

Addition of pozzolana to ordinary port land cement, causes

Q.4.

The process of hardening the concrete by keeping its surface moist is known

Q.5.

Pick up the incorrect statement from the following:

Q.6.

Batching error means inaccuracy in the quantity of

Q.7.

Too wet concrete may cause

Q.8.

The grade of concrete not recommended by I.S. :is

Q.9.

ISI has specified full strength of concrete after

Q.10.

Pick up the correct statement from the following i.

Q.11.

Concrete containing

Q.12.

Addition of pozzolana to cement causes

Q.13.

C.R.R.I. charts are used to obtain a relatioship between strength of concrete and

Q.14.

For construction of structures in sea water, the cement generally preferred to, is

Q.15.

You are asked to construct a massive dam, the type of cement you will use, is

Q.16.

The most useless aggregate is one whose surface texture is

Q.17.

The compaction of concrete, improves

Q.18.

Pick up the correct statement from the following:

Q.19.

The final operation of finishing floors, is known as

Q.20.

For a good concrete

Q.21.

Cement used for normal concrete construction, is obtained by burning a mixture of

Q.22.

The dimensions of alitre forma for measuring aggregates by volume, are :

Q.23.

Pick up the incorrect statement from the following:

Q.24.

The light weight aggregates are obtained from

Q.25.

The internal dimensions of a ware house arem x 5.6 m, and the maximum height of piles is 2.m, the maximum number of bags to be stored in two piles, are

Q.26.

If the effective plan area of a warehouse issq. m, and maximum height of piles permitted iscm, the number of cement bags to be stored, is

Q.27.

Pick up the correct statement from the following:

Q.28.

The shuttering of a hall measuring 4 m x 5 m, can be removed after

Q.29.

Pozzolanic properties exist in

Q.30.

Pick up the incorrect statement from the following: