Q.1.

Mile Stone charts were invented in the year of

Q.2.

Which one of the following represents an activity

Q.3.

Pick up the incorrect statement from the following:

Q.4.

The difference between the time avail-to do a job and the time required to do the job, is known as

Q.5.

The technique for establishing and maintaining priorities among the various jobs of a project, is known

Q.6.

The object of technical planning, is

Q.7.

The salient feature of functional organisation is

Q.8.

Frederick W. Taylor introduced a system of working known as

Q.9.

Critical path method

Q.10.

CPM is

Q.11.

An Executive Engineer may have powers upto

Q.12.

The main principle of an organisation, is

Q.13.

Military organisation is known as

Q.14.

The performance of a specific task in CPM, is known

Q.15.

Pick up the PERT event from the following:

Q.16.

The estimated time required to perform an activity, is known as

Q.17.

Pick up the incorrect statement from the following:

Q.18.

Pick up the correct statement from the following:

Q.19.

If the total float and duration of an activity are 5 anddays respectively, the particular activity can be

Q.20.

Critical path lies along the activities having total float