Q.1.

If D is the duration, ES and EF are the earliest start and finish, LS and LF are latest start and latest finish time, then the following relation holds good

Q.2.

A CPM family includes

Q.3.

Various activities of a project, are shown on bar charts by

Q.4.

A Milestone chart

Q.5.

Works costing less than Rs. 20,are treated as

Q.6.

Construction team means

Q.7.

Final technical authority of a project lies with

Q.8.

The time which results in the leasi, possible construction cost of an activity, is known

Q.9.

Time and progress chart of a construction, is also known as

Q.10.

Completion of an activity on CPM network diagram, is generally known

Q.11.

A critical ratio scheduling

Q.12.

Pick up the correct network for the activities of pouring concrete, erection of form work, removal of form work and curing of concrete from the following:

Q.13.

Critical Path Net Work helps an engineer

Q.14.

A dummy activity

Q.15.

Bar charts are suitable for

Q.16.

A construction schedule is prepared after collecting

Q.17.

Final technical authority of a project lies with

Q.18.

Final technical authority of a project lies with

Q.19.

The first method invented for planning projects, was

Q.20.

Site order book is used for recording