Q.1.

If TL is the latest allowable event occurrence time, total activity slack(s), is equal to

Q.2.

The time by which activity completion time can be delayed without affecting the start of succeeding activities, is known as

Q.3.

The Overall in-charge of an organisation at the site responsible for the execution of the works, is

Q.4.

The main advantage of line organisation, is :

Q.5.

Pick up the correct statement from the following:

Q.6.

Pick up the correct statement from the following:

Q.7.

The artificial activity which indicates that an activity following it, cannot be started unless the preceding activity is complete, is known as

Q.8.

Modular co-ordination of construction means proper

Q.9.

PERT analysis is based on

Q.10.

Power stations are generally treated as

Q.11.

Pick up the correct statement from the following:

Q.12.

The critical activity has

Q.13.

Henry Gantt developed Bar charts for planning and scheduling of projects in

Q.14.

Pick up the correct statement from the following:

Q.15.

The final selection of a construction site, is done by

Q.16.

If t is the duration of an activity, t1 is the latest finish possible moment of its preceding activity and t2 is the earliest start possible moment, the independent float of the activity is

Q.17.

For completion of a project, the critical path of the network represents

Q.18.

An event is indicated on the network by a number enclosed in

Q.19.

Which one of the following represents an event ?

Q.20.

The main disadvantage of line organisation, is