Q.1.
Which one of the following is not an excavating and moving type of equipment?
Q.2.
Whenever an activity has zero total float, then
Q.3.
While filling the tender for any work, the contractor considers
Q.4.
Frequency distribution curves
Q.5.
Economic saving of time results by crashing
Q.6.
If the output of a drag-line for 90° angle of swing at optimum depth of cut is X, then the output for 120° angle of swing at 120 % of optimum depth of cut will be
Q.7.
A wheeled tractor hauling unit is working on firm earth. The total loaded weight distribution of this unit is:
Drive wheels: 25000 kg
Scraper wheels: 10000 kg
If the coefficient of traction for wheeled tractor on firm earth is 0.5, the rimpull which this tractor can exert without slipping is
Q.8.
Critical path method
Q.9.
CPM is
Q.10.
Critical path
Q.11.
Bar charts are suitable for
Q.12.
A dummy activity
Q.13.
The critical activity has
Q.14.
Slack time refers to
Q.15.
Critical path lies along the activities having total float
Q.16.
A construction schedule is prepared after collecting
Q.17.
The most suitable type of equipment for compaction of cohesive soils is
Q.18.
Residential buildings are treated as
Q.19.
Power stations are generally treated as
Q.20.
Earliest finish of an activity is always
Q.21.
Military organization is known as
Q.22.
Various activities of a project, are shown on bar charts by
Q.23.
The first stage of a construction, is
Q.24.
A Milestone chart
Q.25.
A golden rule for the procurement of construction stones, suggests
Q.26.
Batching refers to
Q.27.
Which of the following excavators is most suitable for digging under water?
Q.28.
The time with which direct cost does not reduce with the increase in time is known as
Q.29.
Total float for any activity is defined as the difference between
Q.30.
Which one of the following represents an activity?