Q.1.
The major differences between projects and operations are:
Q.2.
The Overall in-charge of an organisation at the site responsible for the execution of the works, is
Q.3.
The time which results in the leasi, possible construction cost of an activity, is known
Q.4.
Site order book is used for recording
Q.5.
Construction team means
Q.6.
Pick up the correct network for the activities of pouring concrete, erection of form work, removal of form work and curing of concrete from the following:
Q.7.
Critical path method
Q.8.
The salient feature of functional organisation is
Q.9.
The most popular type of organisation used for Civil Engineering Constructions, is
Q.10.
The time by which activity completion time can be delayed without affecting the start of succeeding activities, is known as
Q.11.
Military organisation is known as
Q.12.
Critical Path Net Work helps an engineer
Q.13.
Pick up the PERT event from the following:
Q.14.
If D is the duration, ES and EF are the earliest start and finish, LS and LF are latest start and latest finish time, then the following relation holds good
Q.15.
Final technical authority of a project lies with
Q.16.
The technique for establishing and maintaining priorities among the various jobs of a project, is known
Q.17.
During which phase of a project is the project plan most closely monitored?
Q.18.
Characteristic of construction management are ....i) Complex and it involves a number of individuals from different departments. ii) Unique and cannot be replicated.iii) Consists of a number of associated activities iv) Satisfy the owners requirement and expectations from the project.
Q.19.
Local authorities during construction are....i) Tenaga Nasional Berhadii) Telekom Malaysiaiii) Jabatan Bomba & Penyelamativ) Indah Water Konsortium
Q.20.
Parties involved during the construction except