Q.1.

A construction estimate is used

Q.2.

Pick up the correct statement from the following:

Q.3.

Pick up the element of the cost from the following:

Q.4.

Which method is adopted to develop an approximate or conceptual estimate for perimeter works for buildings from the following:

Q.5.

Keeping in view, the feasibility order of magnitude, the preliminary, conceptual or budget estimates, are prepared by :

Q.6.

The estimator for definitive estimates must be able :

Q.7.

Pick up the correct method adopted for developing the approximate or conceptual estimates from the following :

Q.8.

The construction manager uses the estimate of the project

Q.9.

The financial analysis :

Q.10.

A construction estimate is used

Q.11.

In the cash-flow diagram shown in the given figure

Q.12.

If P is principal amount, i is the rate of interest per annum and n is the number of periods in years, the compound amount factor (CAF) is :

Q.13.

Pick up the correct statement regarding financial statement analysis from the following.

Q.14.

In the cash-flow diagram shown in the given figure