Q.1.
The area of the cross-section of a road fully in banking shown in the given figure, is
Estimating and Costing mcq question image
Q.2.
The cost of the earthwork in excavation for the surface drain of cross-section shown in the given figure for a total length of 5 metres @ Rs. 450% cum, is
Estimating and Costing mcq question image
Q.3.
The value of 'A' of Indian type W.C. shown in the given figure is:
Estimating and Costing mcq question image
Q.4.
The value of 'C' of Indian type W.C. shown in the given figure is:
Estimating and Costing mcq question image
Q.5.
The value of 'B' of Indian type W.C. shown in the given figure is:
Estimating and Costing mcq question image
Q.6.

As per Indian Standard Specifications, the peak discharge for domestic purposes per capita per minute, is taken

Q.7.

Pick up the item of work not included in the plinth area estimate

Q.8.

Pick up the incorrect statement regarding a master trap from the following :

Q.9.

The total length of a cranked bar through a distance (d) atin case of a beam of effective length L, is

Q.10.

Pick up the correct statement in case of water supply.

Q.11.

The most reliable estiamte is

Q.12.

The plinth area of a building not includes

Q.13.

The measurement is not made in square metres in case of

Q.14.

The area is measured correct to the nearest

Q.15.

In the mid-section formula

Q.16.

Pick up the correct statement from the following:

Q.17.

The concrete work for the following part of the building of specified thickness is measured in square metres

Q.18.

While estimating a reinforced cement structure, the omitted cover of concrete is assumed

Q.19.

In case of laying gullies, siphons, intercepting traps, the cost includes

Q.20.

The expected out turn ofmm plastering with cement mortar is

Q.21.

Formm thick cement plastering 1 : 6 onsq.m new brick work, the quantity of cement required, is

Q.22.

According to ISI method of measurement, the order of the sequence is

Q.23.

Cost of fittings and their fixing is specified for the following sanitary fittings

Q.24.

The item of steel work which is measured in sq.m, is

Q.25.

The brick work is measured in sq metre, in case of

Q.26.

Pick up the correct statement from the following:

Q.27.

The excavation exceeding 1.5 m in width andsq.m in plan area with a depth not exceedingcm, is termed as

Q.28.

In long and short wall method of estimation, the length of long wall is the centre to centre distance between the walls and

Q.29.

The main factor to be considered while preparing a detailed estimate, is

Q.30.

The minimum width of a septic tank is taken