Q.1.

While estimating the qualities for the construction of a building, the correct metric unit is

Q.2.

Pick up the incorrect statement from the following:

Q.3.

Size, capacity and materials need be specified for

Q.4.

The trap which is provided to disconnect the house drain from the street sewer is called

Q.5.

The slope of the oultet of 'P trap' below the horizontal is kept

Q.6.

The measurement is made in square metre in case of

Q.7.

A cement concrete road ism long, 8 m wide andcm thick over the sub-base ofcm thick gravel. The box cutting in road crust is

Q.8.

Pick up the incorrect statement from the following:

Q.9.

Pick up the correct statement from the following:

Q.10.

Berms are provided in canals if these are

Q.11.

The rate of an item of work depends on

Q.12.

The expected out turn for earth work in excavation in ordinary soil per mazdoor per day is

Q.13.

The rate of an item of work depends on

Q.14.

Pick up the correct statement regarding the centre line method of estimating a building

Q.15.

The unit of measurement is per quintal for the following:

Q.16.

Pick up the correct statement from the following:

Q.17.

Anti-siphonage pipe is connected to

Q.18.

Anti-siphonage pipe is connected to

Q.19.

Berms are provided in canals if these are

Q.20.

Pick up the correct statement from the following:

Q.21.

For the construction of buildings, the subheads of the estimate are

Q.22.

Due to change in price level, a revised estimate is prepared if the sanctioned estimate exceeds

Q.23.

Pick up the correct statement from the following:

Q.24.

Pick up the correct statement from the following:

Q.25.

The ground surface slopes 1 inalong a proposed railway embankmentm in length. The height of the embankment at zero chainage is 0.5 m, the width ism and side slopes 2:If the falling gradient of the embankment is 1 inthe quantity of the earthwork calculated by prismoidal formula, is

Q.26.

Pick up the correct statement from the following:

Q.27.

Forsq. m cement concrete (1 :4 cm thick floor, the quantity of cement required, is

Q.28.

The expected out turn of brick work in cement mortar in foundation and plinth per mason per day, is

Q.29.

The diameter of a domestic sewer pipe laid at gradient 1 inis recommended

Q.30.

The expected out turn of half brick partition wall per mason per day is