Q.1.

Pick up the correct statement from the following:

Q.2.

Pick up the correct statement from the following:

Q.3.

The floor area includes the area of the balcony up to

Q.4.

The measurement is made for stone work in square metre in case of

Q.5.

The following item of earth work is not measured separately.

Q.6.

The weight of an item is measured correct to nearest

Q.7.

The 'centre line method' is specially adopted for estimating

Q.8.

The value of 'A' of Indian type W.C. shown in the given figure is :

Q.9.

The cross-section of a road partly in banking and partly in cutting is shown in the given figure. The area of the shaded portion is

Q.10.

The cross-section of a road partly in banking and partly in cutting is shown in the given figure. The area of the shaded portion is

Q.11.
The most reliable estimate is
Q.12.
The plinth area of a building not includes
Q.13.
Carpet area does not include the area of
Q.14.
The measurement is not made in square meters in case of
Q.15.
The diameter of a domestic sewer pipe laid at gradient 1 inis recommended
Q.16.
Pick up the item of work not included in the plinth area estimate
Q.17.
While preparing a detailed estimate
Q.18.
The order of booking dimensions is
Q.19.
The brick work is not measured in cu m in case of
Q.20.
The area is measured correct to the nearest
Q.21.
The measurement is made for stone work in square metre in case of
Q.22.
The measurement is made in square metre in case of
Q.23.
The volume is measured correct to the nearest
Q.24.
Pick up the correct statement regarding the centre line method of estimating a building
Q.25.
The expected out turn of half brick partition wall per mason per day is
Q.26.
The expected out turn ofmm plastering with cement mortar is
Q.27.
The inspection pit or chamber is a manhole provided in a base drainage system
Q.28.
The concrete work for the following part of the building of specified thickness is measured in square meters
Q.29.
Pick up the incorrect statement regarding a master trap from the following:
Q.30.
A cement concrete road ism long, 8 m wide andcm thick over the sub-base ofcm thick gravel. The box cutting in road crust is