Q.1.
The rate of an item of work depends on
Q.2.
The 'centre line method' is specially adopted for estimating
Q.3.
According to Indian Standards Institute, the actual size of modular bricks is
Q.4.
The detention period in a septic tank is assumed
Q.5.
Berms are provided in canals if these are
Q.6.
While estimating the qualities for the construction of a building, the correct metric unit is
Q.7.
The expected out turn of brick work in cement mortar in foundation and plinth per mason per day, is
Q.8.
In long and short wall method of estimation, the length of long wall is the centre to centre distance between the walls and
Q.9.
If tensile stress of a steel rod of diameter ‘D’ iskg/cm² and bond stress is 6 kg/cm², the required bond length of the rod is
Q.10.
The value of 'A' of Indian type W.C. shown in the given figure is:
Q.11.
While estimating a reinforced cement structure, the omitted cover of concrete is assumed
Q.12.
The ground surface slopes 1 inalong a proposed railway embankmentm in length. The height of the embankment at zero chainage is 0.5 m, the width ism and side slopes 2:If the falling gradient of the embankment is 1 inthe quantity of the earthwork calculated by Prismoidal formula, is
Q.13.
The brick work is measured in sq metre, in case of
Q.14.
Forsq. m cement concrete (1 :4 cm thick floor, the quantity of cement required, is
Q.15.
Formm thick cement plastering 1 : 6 onsq.m new brick work, the quantity of cement required, is
Q.16.
The reduced levels of points,metres apart along the longitudinal section of a road portion between chainages 5 and 9 are shown in the given figure. If there is a uniform up-gradient of the roadinthe chainage of the point with no filling or cutting is
Q.17.
The main factor to be considered while preparing a detailed estimate, is
Q.18.
The cross-sections for a highway is taken at
Q.19.
According to ISI method of measurement, the order of the sequence is
Q.20.
Anti-siphonage pipe is connected to
Q.21.
The cross-sectional area of the embankment of a canal fully in embankment in the given figure is
Q.22.
In the mid-section formula
Q.23.
The area of a sloping surface of a protective embankment of mean height‘d’, side slopes S: 1 and length ‘L’ is
Q.24.
For the construction of buildings, the subheads of the estimate are
Q.25.
The damp proof course (D.P.C.) is measured in
Q.26.
The cost of the earthwork in excavation for the surface drain of cross-section shown in the given figure for a total length of 5 metres @ Rs.cum, is
Q.27.
As per Indian Standard Specifications, the peak discharge for domestic purposes per capita per minute, is taken
Q.28.
Pick up the correct statement in case of water supply.
Q.29.
The expected out turn of cement concrete 1 : 2 : 4 per mason per day is
Q.30.
The area of the cross-section of a road fully in banking shown in the given figure, is