Q.1.
Which one of the following linings is suitable for shield driven tunnels particularly in the sub-aqueous regions?
Q.2.
Circular section of tunnels is not suitable for
Q.3.
The most commonly adopted pattern of cut holes is:
Q.4.
In the given figure drill holes, heading, mucking and benching are numbered as 1, 2, 3, 4; The correct sequence is:
Tunnel Engineering mcq question image
Q.5.
The cut of a tunnel face is shown in given figure. This is called
Tunnel Engineering mcq question image
Q.6.
Which of the following methods of tunneling is used for long tunnels at great depths?
Q.7.
The correct sequence of drilling equipment for increasing size of holes in tunnels is
Q.8.
Which one of the following is a component of a shield for tunneling?
Q.9.
Railway tunnels are generally
Q.10.
Drift method of tunneling is used to construct tunnels in
Q.11.
Concrete lining is provided concurrently with the driving operation in case of
Q.12.
In Belgium method of tunnelling
Q.13.
Which one of the following is considered to be an advantage of the heading and benching method of tunnel construction?
Q.14.
A tunnel is found more advantageous as compared to the alternate routes because it:
Q.15.
Which of the following lining material is useful for shield driven tunnels in sub aqueous regions?
Q.16.
The most suitable soil for compressed air tunnelling is
Q.17.
Ribs are used for strengthening and stiffening the liner plate for tunnels of diameter greater than
Q.18.
Forepoling method is generally adopted for tunnelling in:
Q.19.
Which of the following is not a component of the shield?
Q.20.
Which one of the following tunneling methods is used for laying underground sewers?
Q.21.
Which one of the following statements is not correct for heading and benching method of tunnelling?
Q.22.
High pressure grouting is generally restored for concreting in the lining if the rock strata is:
Q.23.
Which one of the following linings is suitable for shield driven tunnels particularly in the sub-aqueous regions?
Q.24.
What is the correct sequence of the following events of construction of a shaft in rock?1.Drilling and blasting 2.Timbering 3.Pumping 4.Mucking Select the correct answer using the codes given below Codes:
Q.25.
The advantages of providing a pair of tunnels as compared to only one large highway tunnel is:
Q.26.
An overhead track on a large truss frame is required in case of car changer by
Q.27.
Which one of the following statements is not correct with regard to heading and henching method of tunnelling?
Q.28.
Which one of the following methods is generally adopted for tunnelling in firm ground
Q.29.
The difference of heights of the tunnels above rail tops of BG and MG tracks is kept
Q.30.
Which one of the following methods is adopted for permanent drainage of tunnels?