Q.1.
Programmers use _____ to organize and summarize the results of their problem analysis.
Q.2.
The _____ symbol is used in a flowchart to represent a calculation task.
Q.3.
System prototyping helps the designer in
Q.4.
Which of the following is not a characteristic of a system
Q.5.
Which of the following systems implementation approaches should be used if you want to run the old system and the new system at the same time for a specified period?
Q.6.
Main characteristic of "ring", in Data structure, is
Q.7.
Which of the following is not considered a tool at the system Design phase?
Q.8.
Which of the following is a graphic representation of the modules in the System and the interconnection between them
Q.9.
Structured Programming involves
Q.10.
To reconstruct a system, which of the following key element(s) must be considered :
Q.11.
Which of the following is not considered as a tool at the system design phase?
Q.12.
To avoid errors in transcription and transposition, during data entry, the System Analyst should
Q.13.
A group of related fields, is known as
Q.14.
Advantages of data base system is (are)
Q.15.
The conditions immediately outside a system is called
Q.16.
A feasibility document should contain all of the following except:
Q.17.
The starting point for development of an MIS is;
Q.18.
Sequential or series testing is
Q.19.
A consideration evaluated by management when planning to convert to a computer system is :
Q.20.
Which of the following is used when a company goes outside its organization to develop a new system?
Q.21.
The records in a file or magnetic tape
Q.22.
Acceptance testing is
Q.23.
The _____ symbol is used in a flowchart to represent a step that gets information from the user.
Q.24.
Direct-access organization
Q.25.
In top down analyis and design
Q.26.
A system design aid should primarily
Q.27.
On the feasibility committee, department representatives serve as:
Q.28.
The short statements that represent the steps the computer needs to follow to solve a problem are called
Q.29.
Indexed-Sequential organization
Q.30.
Management's decision to rent a computer system may be based upon
Q.31.
The rule(s) to follow in constructing decision tables is (are):
Q.32.
Elapsed time, between initiating a query and receiving a response is called
Q.33.
Which are the tools not used for System Analysis
Q.34.
During the system study, the executive vice-president and the other managers exercise their responsibility of
Q.35.
Which of the following is (are) not a tool for Application Prototyping?
Q.36.
Back-up procedure helps in
Q.37.
Which of the following appropriately explains the desirable characteristic of good system design?
Q.38.
Data manipulation language (DML)
Q.39.
An example of a hierarchical data structure is
Q.40.
On a systems flowchart, the online manual keeping of input data is identified by using the
Q.41.
The set of. instructions for how to tie a bow is an example of the _____Structure.
Q.42.
Which of the following is not a characteristic of good test data
Q.43.
In the system concepts, term Integration
Q.44.
To run the old system and the new system at the same time for a specified period, the system implementation approach used is
Q.45.
The mistake, committed by interchanging two digits in a numeric held, during data entry, is called
Q.46.
Decision tree uses
Q.47.
Problem analysis is done during
Q.48.
Top-down programming is
Q.49.
Managers who are potential users of the MIS
Q.50.
Positive testing is