Q.1.
The systems conversion technique of totally removing the existing system and immediately implementing the new system is called a
Q.2.
A system design is said to be functionally modular if
Q.3.
Which of the following statements is not true
Q.4.
The data base be prepared until
Q.5.
A programmer reviews the accuracy of an algorithm by _____ it.
Q.6.
The system study project includes
Q.7.
Sequential organization
Q.8.
Which of the following systems implementation approaches should be used if you want to run the old system and the new system at the same time for a specified period?
Q.9.
Which of the following is not a part of a Data Flow Diagram?
Q.10.
Where one has to process all the data records in a file, the best tile organization is
Q.11.
An open rectangle
Q.12.
A _____ is software that is designed for drawing diagrams of information systems, writing process specifications, and maintaining data dictionaries.
Q.13.
On the feasibility committee, department representatives serve as
Q.14.
The feasibilities studied in preliminary investigation is (are):
Q.15.
Branch mark programs are best characterized as
Q.16.
Conversion method in which users, being used to an old system, continue to use the old system, alongside the new system, is
Q.17.

A common reason for changing an information system is

Q.18.

Which of the following is not a part of a Data Flow Diagram?

Q.19.

The first step to the system study project is to

Q.20.

The data stored on a tape or disk file may be recorded in a report form described as

Q.21.

In Data structure, main characteristic of "ring" is :

Q.22.

Which of the following control structures is used in every program?

Q.23.

On the feasibility committee, department representatives serve as

Q.24.

A system design is said to be functionally modular if

Q.25.

A design that consists of a hierarchy of modules; each module has a single entry and a single exit subroutine, is known as

Q.26.

Which of the following is an integrated collection of data with minimum redundancy, so that different applications can use the required data.

Q.27.

A channel for communicating across a boundary between two or more sub¬systems is known as

Q.28.

The time lag, between the keying of the last character on the keyboard input and the appearance of the first output character on the screen, is known as

Q.29.

Difference between Decision - Tables and Decision Trees is (are):

Q.30.

Rapid prototyping proves the quality of a design by

Q.31.

Where one has to process all the data records in a file, the best tile organization is

Q.32.

Which of the following is not a programming control structure?

Q.33.

Conversion method in which users, being used to an old system, continue to use the old system, alongside the new system, is

Q.34.

The longest method of conversion is

Q.35.

The instruction "If it's raining outside, then take an umbrella to work" is an example of the _____ structure,

Q.36.

The systems conversion technique of totally removing the existing system and immediately implementing the new system is called a

Q.37.

Which of the following statements is true

Q.38.

The procedure for evaluating the relative performance of different computers, is done by the process called

Q.39.

Which of the following is not a characteristic of a system?

Q.40.

Benchmarking is used

Q.41.

Structured design produces computer programs that are

Q.42.

The black-box concept:

Q.43.

An open rectangle

Q.44.

The systems conversion technique of totally removing the existing system and immediately implementing the new system is called as

Q.45.

A programmer reviews the accuracy of an algorithm by _____ it.

Q.46.

Changes made periodically to a system, after its implementation, is known as system

Q.47.

At the time of system study, flowcharts are drawn using

Q.48.

Requirements also serve as an evaluation checklist at the end of the development project, so they are sometimes called _____.

Q.49.

Which of the following statements is not true

Q.50.

The four icons used in building Data Flow Diagram are