Q.1.
Quality management system _________ perception of customers towards company.
Q.2.
Good quality construction _________ the wastage of materials, smooth function of the team.
Q.3.
Quality control helps to ___________ the risks of overdesign that ___________ the overall cost.
Q.4.
It opens the area of improvement for quality construction rationally based on the documents from __________ projects.
Q.5.
Quality of construction activities will be tracked by quality management documents.
Q.6.
It __________ job-site concrete handling, curing, sampling and testing procedures.
Q.7.
Minimize the cost of repair and maintenance of the structure.
Q.8.
The concrete mix should be designed in the laboratory with the materials to be used on site.