_________ is defined as the main plank which remains in contact with sides of Trench.
a) Sheeting
b) Wale
c) Sheathing
d) Bracing
Q.2.
Identify the missing data in the below figure.
a) Bracing
b) Sheeting
c) Strut
d) Wale
Q.3.
Identify the missing data in the below figure.
a) Ranger
b) Wale
c) Sheathing
d) Bracing
Q.4.
Identify the missing data.
a) Wale
b) Strut
c) Bracing
d) Sheeting
Q.5.
Identify the given type of Timbering.
a) Runner
b) Stay bracing
c) Box sheeting
d) Vertical sheeting
Q.6.
Identify the given type of Timbering.
a) Sheet piling
b) Runner
c) Stay bracing
d) Vertical sheeting
Q.7.
The __________ arrangement of preventing the sleep of earth in foundation trenches is used when the excavation is to be carried out in the moderately firm ground.
a) Runner
b) Stay bracing
c) Vertical sheeting
d) Sheet piling
Q.8.
The _______ arrangement of preventing the slip of earth in the foundation trenches is adopted when a large area is to be excavated for depth greater thanmeters.
a) Sheet piling
b) Runner
c) Box sheeting
d) Stay bracing
Q.9.
In _______ arrangement, the vertical sheets are placed nearer or sometimes, touching each other.
a) Stay bracing
b) Box sheeting
c) Vertical sheeting
d) Runner
Q.10.
The _______ method is similar to box sheeting except that the work is carried out in stages and at each stage, and offset is provided.
a) Sheet piling
b) Box sheeting
c) Stay bracing
d) Vertical sheeting