Q.1.
The process of rolling, folding and spreading of the particle is known as the __________ of concrete.
Q.2.
For _______ mixing, the materials are stacked on watertight platform, which may be either of wood, Brick or steel.
Q.3.
For ________ mixing, all the material of concrete including water, are collected in a revolving drum and drummer is rotated for a certain period.
Q.4.
For ordinary building works, the ___________ is formed and the concrete is conveyed in pans from hand to hand.
Q.5.
The term ________ of concrete is used to mean the compaction between aggregate and aggregate; between aggregate and reinforcement and between aggregate and forms.
Q.6.
The ________ are the gaps between two individual particles.
Q.7.
Form unimportant works, the consolidation of concrete is carried out by ___________ method which include Ramming, tamping, spading and slicing with suitable tools.
Q.8.
_________ vibrators consists of the Steel Tube which is inserted in fresh concrete.
Q.9.
_________ vibrators are mounted on platforms or screeds.
Q.10.
__________ vibrators are attached to the form work and the external centring of walls, column, etc.