Q.1.
India first nuclear power plant was installed at
Q.2.
Which of the following is a non-renewable resource?
Q.3.
The turbine which is used in tidal power plant for getting continues power is
Q.4.
He system supplying base and peak loads will be more economical if power is supplied by
Q.5.
The nuclear energy is measured as
Q.6.
How much coal is required to generate energy equivalent to the energy generated by 1 kg of uranium?
Q.7.
Water tubes in vertical boiler are __________
Q.8.
When steam or water is used to run a turbine, it can generate __________________.
Q.9.
All of the following are renewable except
Q.10.
A economizer in a boiler
Q.11.
After coal preparation, the coal transfer through
Q.12.
Coal delivery, preparation, Coal handling, boiler furnace, ash handling, and ash storage consist of _____ circuit
Q.13.
Porcelain is produced by firing at high temperature of which all mixtures?
Q.14.
What is the dielectric strength of porcelain?
Q.15.
On what factor does the string efficiency of a string of suspension insulators dependent?
Q.16.
The number of discs in a string of insulators forkV ac over head transmission line lies in the range of
Q.17.
What is the maximum voltage level upto which the pin type insulators can be used?
Q.18.
Assembly of which type of insulators are used as strain type of insulators?
Q.19.
Which type of insulators is mainly used for low voltage overhead lines?
Q.20.
Condenser steam from condenser is used as