MCQGeeks
CBSE
JEE
NTSE
NEET
English
UK Quiz
Quiz
Driving Test
Practice
Games
Quiz
Hazardous Waste Management
Hazardous Waste Management Interview
Quiz 1
Solution
Q.1.
The final step in RCRA’s cradle-to-grave concept is ___________
a) Disposal
b) TSDF
c) STDF
d) TSFF
Q.2.
The unit-specific design is required to __________
a) Prevent the release of HW
b) Good housekeeping
c) Analysis
d) Export activities
Q.3.
TSDFs has to obtain permission in the form of ___________ permit.
a) CERCLA
b) SARA
c) RCRA
d) HPL
Q.4.
RCRA permits require facilities to develop emergency plans.
a) False
b) True
Q.5.
Permits are typically granted for a period up to ____ years.
a) 7
b) 8
c) 9
d) 10
Q.6.
Transporters of hazardous waste does not require RCRA permit.
a) True
b) False
Q.7.
What type of waste does Subtitle D of RCRA regulate?
a) Solid hazardous waste
b) Chemical hazardous waste
c) Non-hazardous solid waste
d) D. Radioactive waste
Q.8.
Storage of incinerable hazardous waste at the site is ______ months.
a) 2
b) 4
c) 6
d) 8
Q.9.
External safety audit at an incinerator facility is carried out once in _____ year.
a) 1
b) 2
c) 3
d) 4
Q.10.
The design of TSDF facilities should follow __________ guidelines.
a) CPCB
b) PCB
c) SPCB
d) LPCB
Q.11.
Solidification of HW is done at TSDF to reduce ________
a) Area
b) Volume
c) Analysis
d) Record keeping
Support mcqgeeks.com by disabling your adblocker.
×
Please disable the adBlock and continue.
Thank you.
Reload page