Q.1.
Military type of organisation is known as
Q.2.
The simplex method is the basic method for
Q.3.
According to MAPI formula, the old machine should be replaced by new one when (Here, CAM = Challenger's Adverse minimum, DAM = Defender's Adverse minimum)
Q.4.
The essential condition for the decompression of an activity is that
Q.5.
PERT
Q.6.
Which one of the following techniques is used for determining allowances in time study?
Q.7.
Process layout is employed
Q.8.
The value engineering technique in which experts of the same rank assemble for product development is called
Q.9.
Travel charts are used to
Q.10.
The interchangeability can be achieved by
Q.11.
Actual performance of a task is called
Q.12.
Which of the following wage incentive plan is applied to all workers?
Q.13.
Halsey plan of wage incentive
Q.14.
CPM requires
Q.15.
PERT is a project planning and control technique.
Q.16.
The most suitableincentive plan for the maintenance section of an industry will be
Q.17.
Process layout is also known as
Q.18.
For handling materials during manufacture of cement, a __________ is widely used.
Q.19.
Linear programming can be applied successfully to
Q.20.
The product layout is more amenable to automation than process layout.