Q.1.
Jidoka
  • 0%
    Failsafe, idiot proof
  • 0%
    Traffic light signal (demonstrates how production is going)
  • 0%
    Empowerment
  • 0%
    assignment
Q.2.
Kanban
  • 0%
    Traffic light signal (demonstrates how production is going)
  • 0%
    CEO of GE. Said to get rid of unnecessary RAMP (Reports, Analysis, Meetings, Policies & Procedures)
  • 0%
    Card (card that facilitates pull from previous station in JIT - the card is an authorization for the next container of material to be produced)
  • 0%
    "Good change" -continuous improvement
Q.3.
Jack Welsh
  • 0%
    CEO of GE. Said to get rid of unnecessary RAMP (Reports, Analysis, Meetings, Policies & Procedures)
  • 0%
    Safety - build in good practicesSupport/maintenance - reduce variability and unplanned downtime
  • 0%
    overproduction, waiting, transporting, inappropriate processing, unnecessary inventory, unnecessary/excessive motion, defects
  • 0%
    Card (card that facilitates pull from previous station in JIT - the card is an authorization for the next container of material to be produced)
Q.4.
Poka-yoke
  • 0%
    Empowerment
  • 0%
    "Good change" -continuous improvement
  • 0%
    variability increase
  • 0%
    Failsafe, idiot proof
Q.5.
Kaizen
  • 0%
    C. JIT prevents long runs of defects.
  • 0%
    "Good change" -continuous improvement
  • 0%
    Card (card that facilitates pull from previous station in JIT - the card is an authorization for the next container of material to be produced)
  • 0%
    Traffic light signal (demonstrates how production is going)
Q.6.
JIT systems carry inventory just in case something goes wrong.
  • 0%
    True
  • 0%
    False
Q.7.
Hidden problems are generally uncovered during the process of reducing inventory.
  • 0%
    True
  • 0%
    False
Q.8.
Waste is anything that does not add value from the​ consumer's perspective.
  • 0%
    True
  • 0%
    False
Q.9.
The​ 5Ss-sort/segregate, simplify/straighten,​ shine/sweep, standardize, and​ sustain/self discipline-are important to lean production because they act as a means to reduce waste.
  • 0%
    True
  • 0%
    False
Q.10.
2 additional Ss
  • 0%
    Traffic light signal (demonstrates how production is going)
  • 0%
    CEO of GE. Said to get rid of unnecessary RAMP (Reports, Analysis, Meetings, Policies & Procedures)
  • 0%
    Safety - build in good practicesSupport/maintenance - reduce variability and unplanned downtime
  • 0%
    overproduction, waiting, transporting, inappropriate processing, unnecessary inventory, unnecessary/excessive motion, defects
Q.11.
The seven wastes
  • 0%
    overproduction, waiting, transporting, inappropriate processing, unnecessary inventory, unnecessary/excessive motion, defects
  • 0%
    Card (card that facilitates pull from previous station in JIT - the card is an authorization for the next container of material to be produced)
  • 0%
    CEO of GE. Said to get rid of unnecessary RAMP (Reports, Analysis, Meetings, Policies & Procedures)
  • 0%
    Safety - build in good practicesSupport/maintenance - reduce variability and unplanned downtime