Q.1.
EWMA and cusum charts can be used for the short production runs because ____________
Q.2.
Which of these is suitable for the short run environment?
Q.3.
Which of these is not one of the areas for which, the self starting cusum approach uses regular process measurements for?
Q.4.
Which of these is eliminated by the self starting approach?
Q.5.
The false alarm rate is _______ when small number of subgroups is used for the Shewhart control charts.
Q.6.
Who was the first person to study the effect of the number of subgroups used for x bar and R chart control limit calculation on the false alarm rate?
Q.7.
Which of these charts can be used instead of Shewhart control charts, in the case of small number of subgroups used to construct the charts, which were recommended by Quesenberry?
Q.8.
Which method was suggested by Del Castillo and Montgomery, to be used instead of the Q-chart to get better ARL performance?
Q.9.
Which of these is not a purpose for which control charts are produced for?
Q.10.
Which of these is used when the process has achieved high capability level?
Q.11.
Which of these is not a name of Modified control limits for x̅ charts?
Q.12.
Which of these is a method used when the process capability is quite high?
Q.13.
Which of these does not say that the modified control limits must be applied?
Q.14.
The six-sigma approach when implemented for a long time, the process may need modified control charts.
Q.15.
If the Cpk=0.the usage of modified control charts is very necessary.