Q.1.
Which of the following refers to ‘Level Scheduling’?
Q.2.
Which of the following is not a benefit of Heijunka?
Q.3.
Calculate Takt Time when there areminutes in work day and the customer demand isunits a day.
Q.4.
Which of the following is the meaning of the word HoshinKanri which is extensively used in strategic planning?
Q.5.
HoshinKanri eliminates wastes that originate from poor communication and inconsistent direction.
Q.6.
The implementation of HoshinKanri begins with a strategic plan.
Q.7.
In HoshinKanri, the tactics are laid out by ________
Q.8.
Which of the following wastes is not eliminated by implementation of continuous flow?
Q.9.
Continuous flow is a technique of manufacturing where work-in-process smoothly flows through production with ______ buffers between various steps of the manufacturing process.
Q.10.
Bottleneck analysis ______