Q.1.
Generator transformers are ________________
Q.2.
In the CCGT, how many step-up transformers will require?
Q.3.
Which of the following is one of the criteria of selecting particular generator transformer?
Q.4.
Generator transformers can undergo sudden load-changes.
Q.5.
Station transformers are generally used for ____________
Q.6.
Which of the following does not follow the criteria of station transformer?
Q.7.
Operating load factor of station transformer must be _________
Q.8.
For a unit transformer HV voltage must be _____________
Q.9.
What voltage of On-load tap-changer is required for unit transformer?
Q.10.
On-load power factor for generator transformer is __________